Guide
Getting ready for ERX: a checklist for businesses
A guide to the questions a business can use to assess its readiness for ERX, the observe, suggest and limited execution stages, data and authority preparation, and where Factorbooks Autonomous ERX fits.
Why does ERX readiness start before choosing software?
ERX readiness starts with a business assessing its process, data and authority structure. The ERX approach Gartner defined adds decision and execution capability on top of a reliable record structure. If the foundation is weak, whatever is added on top stays weak.
This checklist does not explain the ERX concept in detail; the ERX page and the guide on the difference between ERP and ERX do that. It covers the questions a business can ask itself and a sequence it can follow.
Which questions show whether you are ready for ERX?
If you can answer the questions below clearly, your readiness is well advanced. A question you cannot answer points to your priority work area.
- Process: Which event starts each recurring task, and which steps does it go through?
- Rules: Is the decision rule for each task written down, or does it sit in people’s experience?
- Data: Are customer, material and account records in one structure and consistent?
- Records: Is the accounting entry derived from the transaction, or entered separately afterwards?
- Authority: Who approves which transaction, and at what amount does someone else step in?
- Exceptions: Who is responsible for records that do not match or stay incomplete?
- Trail: Can you see afterwards which transaction a record came from?
- Measurement: Do you measure manual interventions and corrections today?
What are the observe, suggest and limited execution stages?
Readiness can be built in three stages: observe, suggest and limited execution. Each stage starts once the previous one has been seen to work reliably.
- Observe: The system watches transactions and makes exceptions and recurring patterns visible; it takes no action.
- Suggest: The system proposes the next step and a person approves. You measure how many suggestions turn out to be right.
- Limited execution: The system completes selected, low-risk tasks with clear rules on its own, within defined limits.
Why does data quality come before automation?
Automation does not fix data; it speeds up how it is processed. A wrong customer code or an inconsistent account structure spoils a single record when work is manual, but the same error can spread to many records when work is autonomous.
That is why data should be made accurate, consistent and reliable before automation is added. The main points to check are these:
- Customer, material and project codes should be unique and current.
- A single definition should be used for currency, unit and document status.
- Open items such as unmatched invoices and payments should be cleaned up.
- The link between a document and its accounting entry should be traceable.
How are authority limits set?
An authority limit defines what the system may do on its own and where it must stop and ask for approval, by transaction type and amount. Moving to execution without writing this down leaves it unclear who is responsible.
- The transaction types the system may complete on its own
- The transactions that need approval and the roles that approve them
- Segregation of duties: transactions the same person may not both start and approve
- When automation must stop and how to recover from an error
Which measures are tracked during readiness?
A few measures, taken from your own data, show whether readiness is progressing. This guide gives no target values; the starting values come from the business’s own records.
- Time from the start of a transaction to its closing
- Number of records needing manual intervention
- Number of records corrected afterwards
- Number and age of open items
Where does Factorbooks Autonomous ERX fit in readiness?
Factorbooks Autonomous ERX answers the record, rule, authority and trail questions in this list inside the transaction core. The 27 modules in the Autonomous Business menu run the work on their own: control happens at the moment of the transaction, the record is derived from the transaction, and transactions at defined approval points go to an authorised person.
The autonomy is rule-based and auditable: the same input gives the same result and every action has an audit trail. Details are on our ERX page.
This guide is for general information only. For current regulatory thresholds and dates, rely on the Turkish Revenue Administration (GİB) announcements and your accountant.